Tag Archives: Toronto Transit

The “One City” 30-year plan possibly 20-years too late?


English: "Transit City" billboard pr...

English: “Transit City” billboard promoting proposed LRT expansion in Toronto by the TTC (Photo credit: Wikipedia)

Ford says “No”, and Karen says “Yes”! Most Torontonians know we need subways and better transit. We need a proper transit system in Toronto and transit is a smart investment. I was amazed to see how bad transit is in Toronto, when I attempted to make a simple trip on the roads the other day. To travel on Eglinton, from Wynford to Warden, took approximately 20-30 minutes, and I thought I was taking a short-cut. On another day I got off the 401 and got stuck on York Mills. I could not believe how many cars were on the road.  I understand why people are stressed. Drivers are upset in traffic, it makes sense. Trips that should take 10-15 minutes are now taking 45 minutes to an hour. There is not even a proper strategy for bicyclist downtown.

So what to do now? Well we have ‘another’ new 30-year transit plan. I have some news for our politicians, and I will keep it simple. We don’t have 30-years! I think we actually only have 10 years, max 15. We need shovels in the ground now and some out of the box ideas.

1. GO Transit has lines and tracks crossing through the city. Keep it simple! We need trains running on these lines in minimum 20-30 minute intervals; both ways, not in one direction downtown. Let’s utilize some of the infrastructure that exists and make it better.

2. Open up David Millers original Transit City plan and do more. Lets enhance that plan and fix what needs to be fixed. Get it done! No more long-term plans. Let’s get the maximum value out of the plans we have.

3. Let’s get a downtown “No Frills” relief line for Toronto. It does not have to be fancy. There are under-utilized CP/CN lines in the city. Put something on them and get people moving! In Ottawa they created a line on a single track, with track switching on certain portions of the line. It was not fancy, but they got it done.

4. Where are the BRT‘s and bike networks? Lets use our hydro corridors for BRT’s and a proper bike network.

5. Let’s get inventive and use Lake Ontario to move people to downtown Toronto, between Oshawa, Bowmanville, Hamilton and more.

6. Possibly re-visit Leslie as a relief to the Don Valley Parkway, maybe even using it for transit. We don’t need a massive change, but when we get to Eglinton somehow connect the road to the Bayview extension via a tunnel or via the valley in a creative fashion.

7. Merge transit across the city and lets get Presto implemented everywhere! Should Metrolinx be in charge of the entire transit system across the G.T.A?

We have to stop saying Torontonians, and G.T.A residents, cannot afford new taxes. I don’t like them either, but I don’t like to see people idling their cars. I don’t like stress. It’s pointless, if we know the solution to a better and healthier city. We do not need fancy, we just need to move! We know something must be done, so let’s get it done now; not 30 years down the road. It’s nice to have a plan, but we have had too many since the Liberal Peterson Government. We need transit in 10-15 years, not 30.

Advertisement

Eglinton subway not in cards – David Miller


But only paperwork in the way of Spadina extension, Mayor says
By: Natalie Alcoba
National Post Published: Saturday, July 26, 2008

Government officials signalled yesterday that construction will soon start on the anticipated Spadina subway extension, even as the Mayor dismissed a new push to build a subway along Eglinton Avenue. “You should build subways in extremely dense neighbourhoods where you have two-way traffic because there are offices and people living … you don’t build subways where there’s not that ridership and it’s not projected to be” along Eglinton, Mayor David Miller said yesterday. “And there isn’t the money, it’s that simple.”

Toronto’s ambitious Transit City project, which is planning for new light rail lines across the city, includes a light rail route along Eglinton that would extend from the airport to Kennedy, and run underground in a a 10-kilometre tunnel between Laird Drive and Keele Street.

But area city councillors and Metrolinx, the province’s GTA transportation agency, believe Eglinton may in fact warrant a subway. Metrolinx chairman Rob MacIsaac said the agency has not settled on the subway as the best route, but preliminary ridership results suggest it could use something more than a Light Rail Transit. The LRT is projected to cost $2.24-billion, which Mr. Miller says is about $4-billion less than the cost of a subway.

read more | digg story

Before You Move: Where Are The Next Transit Hubs?


Toronto Light Rail NetworkHere’s an easy question: where do you live?

Now here’s a much harder one: where should you live to ensure you’re near a GTA transit hub and how will the TTC’s plans for expansion impact the value of your home?

The answer to both queries can be worth thousands of dollars because the old real estate axiom about location, location, location has a well-known addendum: being near a subway or major transit route can instantly increase what your home is worth without you having to do anything at all.

But can you tell where they’re going to build or if the place you’re looking to buy will one day find itself on a subway or major transit line? The answer is yes, if you believe government plans about where officials hope to put the new routes.

Adding transit takes years of planning and a commitment of millions of dollars and all of it has to be done well in advance. That means the powers-that-be know where they’ll be putting the new tracks and trains as much as a decade or more before a shovel actually hits the ground.

One of those locations could be along waterfront-adjacent Cherry Street, which would make the folks on Condo Row lick their collective chops at the thought of bulging resale values.

“Streetcar access is phenomenal in terms of adding to value and presence … people want to be on a streetcar line,” said David Jackson, a Toronto urban planner.

Plans for the new tracks could start as early as spring 2009, while the underground expansion of the Don Mills subway line all the way to Morningside could have homeowners on the north side of town dreaming of dollars, though there’s no official date for that project to commence.

So just how much of a bottom line difference are we talking about here?

“Easily thirty to fifty thousand dollars,” confirmed Toronto realtor Janice Mackie. “Thirty thousand dollars is a parking spot … you don’t have to purchase that.”

What’s more, given the constant rise in gas prices and the GTA’s traffic volume, the Better Way may soon be looking even better still.

And while the two mentioned above are among the more central and immediate transit expansion schemes in the works, there are dozens of others being hatched around the GTA and Ontario as well.

Toronto Transit City

Here’s where you can check out the best laid plans that are being laid out right now.

Transit City: Can tell you about planned expansions in the city of Toronto.

Transit City map: Have a peek at what a future light rapid transit system might look like.

Move Ontario 2020: See the plans for the rest of the GTA here.

Move Ontario 2020: See a map for the GTA

Waterfront Toronto: The downtown core may soon look a lot different than it currently does.

Metrolinx: Transforming transit in the GTHA

See original CityTV News video and read more | digg story

TTC to seriously consider relief line by 2018, Giambrone says…


“TTC chairman Adam Giambrone says a new subway line cutting through the bottom of the city is a “good idea,” one the TTC will start looking at seriously by 2018. The Downtown Rapid Transit project, or Downtown Relief Line (DRL), would relieve congestion at the Bloor-Yonge interchange and the line’s busiest stretch between Yonge and Union stations.”

http://transit.toronto.on.ca/subway/5113.shtml

read more | digg story

1) Can we really wait until 2018?

2) Can the Yonge line truly handle the addition and influx of passengers from Richmond Hill and beyond?

3) Why are there so few options to get downtown?

For the downtown Toronto core to remain vibrant these questions need to be answered. While politicians debate who is at fault, who should pay and when we should start “INVESTING” in transit they continue to approve new condo developments, higher density and more taxes. How are these people going to get around? This is not Vancouver and unfortunately we do not have a system like Montreal or New York. When will our politicians wake up and make the investments needed for our city? Or better yet, when will “you” wake up?

By Andy MJ
a.k.a “The GTA Patriot”
Toronto, Ontario

Merging the TTC and GO under GTTA control?


The Toronto Star, CityTV (Breakfast Television) and other media outlets are reporting that the TTC maybe “high-jacked” by the Liberal Government of Ontario, which may have been secretly planned all along. Rumors are flying high that the TTC may be taken over by the Government of Ontario and merged with GO Transit, under the umbrella of the GTTA (Greater Toronto Transit Authority). Many have believed that this would eventually happen, since the TTC has become so large and important to the welfare of the GTA that it may have become just too large for the City of Toronto to handle. Of course speculation is that this may have been their plans all along. Many have wondered, for a while now, why the province was so adamant on expanding the TTC into Vaughan, and beyond, when it seem illogical for Toronto to care on managing transit into the other regions of Toronto. Greg Sorbara, one of the proponents of the plan, tied up funds to ensurCity Halle that the expansion into Vaughan took place. If this is the case it may have simply been the master plan of the province. Now the Liberal Government has a majority and there would be no stopping them from doing this. Of course this is only rumored, however one has to wonder if this was not the plan, than why bother with the GTTA? The Metropass has passed the mythical bar of $100, now costing $109 dollars. With the TTC complaining about funding, almost every year, the province may simply believe that the TTC is just too much for the City of Toronto to handle, removing control of the Toronto symbol from David Millers hands.

Ironically, moving the control of the TTC to the province would allow Toronto to better balance their books, now that council passed the new taxes. In some ways it would seem that the province may have been waiting for the results. Or it maybe a simple choice of choosing what they feel is best. We know that the Liberal government, although they promised, has not uploaded services that were downloaded during the Mike Harris years. What would happen if the province simply decides to take control of the TTC, covering all costs and leave everything else as is? Would, removing the TTC from Toronto’s books balance the budget? It definitely would help, however how would service be affected? Would the province run the service as is, or run it like GO Transit? Would they merge services with GO Transit? Would they start Zone fares? Would you be able to jump on the “GO” and then to the TTC seamlessly? There are hosts of unanswered questions. Or, is it time for the TTC to simply grow up?

TTC StreetcarThe TTC is a Toronto icon, from the storied streetcars of yesteryear to the way the subways were originally created along Yonge Street. I will not go into a rant about the TTC not being able to innovate and change the way they do business. The TTC, unlike other transit systems across North America, receives little Federal funding for operating costs. However, at least the Federal government did kick in the needed funding for the extension of the subway to Vaughan (ill-conceived, but done nonetheless). If this really does happen then some of the moves the government made, along with their promises for Move2020, would make sense. What we should debate is whether this is a good idea or a bad one? I am not sure if this is a good or bad idea, but do not be too quick to jump on the bandwagon? Does the province understand the needs of Malvern, King Street West, Don Mills, North Etobicoke or the Beaches? What about those routes that do not make a lot of money? Will they be continued or operate like other jurisdictions? Do they think streetcars or buses are more important? Do they care to support the “Transit City” initiative or Subway expansion? What does this mean for the YRT and VIVA? How about Mississauga Transit? These are all unanswered questions, which Torontonians, and GTA residents, should think about and want answers to. What maybe good for Markham, Vaughan, Mississauga and others, may not be good for Toronto, and so visa versa. The debate on merging the TTC with GO, and surrounding systems, has been going on for years, with pros and cons on both sides. This was not on the table during the last provincial election; however loosing the TTC may be the evolution of progress or the greatest public transit “coup” ever conceived by the Province of Ontario.

Read more news from the Toronto Star Article, below.
http://www.thestar.com/News/Ontario/article/269896


Andy MJ
a.k.a. “The G.T.A Patriot”

Toronto, Ontario