Tag Archives: Spadina

Subways for the Downtown Relief Line


The war over Sheppard was barely finished and Andy Byford is already talking about a Down-town Relief line; hoping to take the pressure off the packed Yonge-University-Spadina subway. For years transit leaders have talked creating a line, however other priorities have always taken precedence. With Andy Byford openly talking about the line, maybe we will start to move away from the wrangling over transit. Originally the plan was part of the “Big Move”. The line, initially, would start at Pape station and then move onwards, with a limited amount of stops, to Union station.

TTC - Downtown Relief Line

Original Proposed DRL for Toronto

At the moment the talk merely hovers around Pape to Union, however there is the potential possibility of sending it north to Eglinton East (through Thorncliffe Park and Flemingdon Park). Doing this could negate the need for a Don Mills LRT, opting for a BRT. There may also be the possibility of sending the line, over-ground through the Don Valley, to the Sheppard line; which would at least give some sense of completion to the line.

Leaside Bridge

Over-ground is definitely a cheaper option than underground. However a big problem is the Millword (Leaside) bridge. Sending a subway under the bridge would be quite costly. Closing the bridge, for subway construction, would be a traffic nightmare for the area. I imagine, for now, sending the line into the Don Valley area is out of the cards, however you never know what options the TTC may come up with; being that the Don Valley and the option of by-passing Thorncliffe all together or utilizing the open corridors in the area (Hydro, etc…) It will be interesting to see if any happens or if the DRL is ever built. Some will have to be done to move pressure from the Yonge line. I imagine the next civic election will be something to behold in Toronto. With Mayor Ford pushing for subways and both levels of government out of cash, how will these subways be built?

Rat-sighting restaurant under renovation


By DON PEAT, Sun Media

A Chinatown restaurant shutdown after some camera un-shy rats appeared in the front window is now under renovations.

Toronto Public Health officials confirmed yesterday Happy Seven restaurant is undergoing renovations before inspectors conduct a final re-inspection of the Spandina Ave. eatery.

“Swatow Restaurant at 309 Spadina Ave. was closed Tuesday for failing to prevent an insect infestation and failing to provide adequate pest control, among other infractions.”

Read more

Quitely released press information – Government of Canada invests in Toronto Transit


No. H 218/08
For release – September 5, 2008

FLAHERTY ANNOUNCES FUNDS WILL BEGIN FLOWING TO SPADINA SUBWAY EXTENSION

Spadina Extension to Vaughan

Spadina Extension to Vaughan

TORONTO — People living and working in Toronto will begin to benefit soon from reduced traffic congestion, shorter commuting times, and cleaner air through the Toronto-York Spadina Subway extension. The Honourable Jim Flaherty, Minister of Finance, on behalf of the Honourable Lawrence Cannon, Minister of Transport, Infrastructure and Communities, today announced that a contribution agreement has been signed by the federal, provincial and municipal governments, meaning that funds for the completion of the project will now begin flowing.

“The Government of Canada is helping to provide the students, commuters, and families of the Greater Toronto Area with transportation options, getting people out of their cars and onto public transit,” said Minister Flaherty. “We are committed to working with our provincial and municipal partners to improve transportation infrastructure across the country. The Toronto-York Spadina Subway extension is an excellent example of how we’re delivering real results.”

The Toronto-York Spadina Subway Extension project encompasses an 8.6 kilometre extension to the Toronto Transit Commission’s Spadina subway line, extending subway service to York University and the Vaughan Corporate Centre. With the signing of the contribution agreement, the Government of Canada will commit to paying up to $622 million under the Building Canada infrastructure plan towards the design and construction of this project. This is in addition to the $75 million already received by the project under the Public Transit Capital Trust.

In addition to the funding being made available for the Spadina Subway extension, several other transit projects in the GTA are being funded by the Government of Canada. They include:

  • York VIVA (Phase 1) — $50 million toward a $164 million bus rapid transit project;
  • York VIVA (Phase 2) — up to $85 million toward the second phase of this bus rapid transit project;
  • GO Transit Rail Improvement Program — $385 million toward a $1 billion project; Through this project, six of the seven rail corridors being used by GO are being upgraded, as well as some work around Union Station;
  • Brampton AcceleRide — $95 million from the Canada Strategic Infrastructure Fund toward a $285 million Bus Rapid Transit project;
  • Mississauga Bus Rapid Transit — $83 million from the Canada Strategic Infrastructure Fund toward a $249 million project; and
  • Toronto Transit Commission Strategic Capital Projects — $350 million from the Canada Strategic Infrastructure Fund towards a $1.2 billion project.

The Government of Canada provided $500 million for public transit infrastructure in Budget 2008. This will provide up to $194.5 million to Ontario under the Public Transit Fund. Under the previous Public Transit Capital Trust, the Province of Ontario has received $351.5 million, which it can use for various transit projects over the next three years. In addition, all Ontario municipalities will continue to receive a GST rebate.

“It’s clear that for the Government of Canada, investing in transportation infrastructure for the people of the GTA has been a key priority,” Minister Flaherty said. “We are delivering on this priority even further today with the Spadina Subway extension.”

– 30 –

Contact:
Chisholm Pothier
Press Secretary
Office of the Minister of Finance
613-996-7861

Transport Canada is online at www.tc.gc.ca. Subscribe to news releases and speeches at www.tc.gc.ca/e-news and keep up-to-date on the latest from Transport Canada.

This news release may be made available in alternative formats for persons with visual disabilities.

Time to get more use out of the Sheppard Subway line and go west?


To be honest, I love subways and I have a bit of a bias towards the Sheppard Subway line. I have always believed that if the subway was completed, or at least ½ done, than it would have never been considered as an option to close or shut down, in the Toronto tax crunch. I still blame the Harris “conservatives” for their shortsighted plan to fill in the Eglinton West Subway dig, which was already well under way. Along with the plan to offer a no frills Sheppard subway line, stopping it at Don Mills, rather than the obvious Victoria Park, or even better yet Warden Avenue in Scarborough. Regardless, what was done is done and we have a subway that needs finishing. However, there maybe a better plan, that has not been considered. The fact is that the Sheppard line exists and it needs to be completed. One of the transportation issues, I have found, in the city is the lack of an east-west line across the top of the city. Now that the Liberal Government has decided that the subway will go to Vaughan; even though I feel that it should only go to York University for now, consideration should be given to the idea of completing the Sheppard Subway westwards and then curving the Sheppard line north-west to York University and beyond. It was pointed out to me by ‘Cal’, from the Toronto LRT information blog,

“that extending the Sheppard line west to Downsview then up to York U/Steeles may be a better use of the money in terms of providing a more useful connection and making the Sheppard line more useful.”

In addition, the Sheppard Subway lines signaling system and design are based on newer technology, which would allow greater flexibility in the operation of trains (I.e. driver-less subway cars, the possibility of multiple lines, operations in different directions, etc…). It has already been stated that millions (maybe more) would have to be spent to upgrade the Yonge-University and Spadina lines. If this is the case, why not simply complete the Sheppard line westwards, along Sheppard Avenue and then northwards? Along Sheppard we would only need a stop at Bathurst, for now and since the trains are only 4 cars long, for now the platforms could be a bit smaller (in terms of the amount of people using the line). In addition, albeit maybe a bit of pie in the sky thinking, but we could also consider imploring some New York Subway style options in the northern part of Toronto. I remember at one point, before the EA (Environment Assessment) was completed for the Spadina line to York University one of the Toronto councilors wanted the line to go along Finch westwards towards Jane & Finch and beyond, due to the high-density in the area.We all know that the TTC will not send all trains north into Vaughan. I believe that it will be every third train; however I could be wrong (anyone can update me on that one to correct me on the intervals). This means that there will need to be a larger trail-track or interchange at either the Steeles or YorkUniversity stations. If this is the case, why not send one portion northwards into Vaughan and the other westwards along Finch or better yet , using a cheaper option, the Finch Hydro corridor into Etobicoke and beyond, using a Sheppard-Vaughan-Finch line instead? This is just an idea; however I would hope that Toronto officials and the provincial government would think outside the box a bit and complete the Sheppard line. It’s just an idea, but I hope that the Sheppard line put to better use.You will notice that I am not advocating going eastwards to Scarborough Town Centre. I just believe that if we can “kill two birds with one stone”, than lets use the Sheppard Line to complete Greg Sorbara’s dream of a subway to Vaughan and get a little more use out of the subway. I am a big believer in portions of the “Transit City” plan, offered by the City of Toronto. I just feel that we need to somehow finish or put Sheppard to better use. Of course I would have preferred an LRT, for Sheppard in the past, but that was said and done (no sense crying over split milk). If we have no choice, in getting a line to YorkUniversity than why not maximize what we can do for the city, now? Once the Sheppard-Vaughan-Finch line is completed, then we can end this argument and stain on Toronto’s past. We can then move onto using LRT, light-rail and other forms of technology to move people around the Greater Toronto Area. The unfortunate thing is politics, may again get in the way or progress. I can only hope that officials in charge will do the right thing.

By: Andy MJ
a.k.a “The GTA Patriot”
Toronto, Ontario